Speedier Deliveries and Finished Stock

Wilson Power Solutions


Express Delivery of Stock Transformers

Wilson Power Solutions now hold finished stock of both Tier 1 and Tier 2 (EU Eco Design Directive) compliant ground mount distribution transformers, ready for next day (or 48h) express deliveries.


All stock transformers for next day /48h delivery are offered as 'box-to-box' type and come with the following base specification:


  • HV off load tap changer with additional tap setting (+/-2.5%, +/-5.0%, +7.5%),
  • Bottom entry HV cable box suitable for 1 x 3c cable,
  • LV cable box suitable for 3 x 1c cable per phase and neutral.



Our stock for next day / 48h delivery includes:


Wilson E2 super low loss amorphous range(Eco Design Tier 2 compliant, liquid filled distribution transformers) with the following ratings:



  • 315kVA
  • 500kVA
  • 800kVA
  • 1000kVA
  • 2000kVA


Wilson Power Solutions
Wilson Power Solutions

Wilson E1 range (Eco Design Tier 1 compliant, liquid filled distribution transformers) with the following ratings:


  • 315kVA
  • 500kVA
  • 800kVA
  • 1000kVA
  • 1250kVA
  • 1500kVA
  • 1600kVA
Discover More



Where you require additional accessories such as Oil Temperature Indicator (OTI), Winding Temperature Indicator (WTI), Magnetic Oil Gauge, Pressure Relief Device (PRD), or Conservator & Bucholz Relay, then lead times will extend out a little to 2-4 weeks depending on our production workload at the time.


If you require MV or LV Switchgear on your transformer please contact us for a lead time to confirm details.

 

For all other ratings (at standard specifications), or if finished stock levels have been depleted, our typical lead times are now between 6 and 8 weeks (see below).



Faster delivery of standard stock now 6-8 weeks


Following feedback from our customers we have invested in a comprehensive stock build programme.


As a result our standard rated distribution transformers across the Wilson e1 and Wilson e2 ranges are now available within 6-8 weeks. This is an industry leading availability standard, and one we will strive to maintain.



Copyright Wilson Power Solutions 2018


NEWSLETTER

Interested in more news and events that we might be hosting?

Sign up to our newsletter

© Wilson Power Solutions 2018
Westland Works, Westland Square, Leeds, LS11 5SS
Wilson Power Solutions uses cookies.
By browsing the site, you're agreeing to our cookie policy